The family is loving our first season with the Sport Nautique.
Purchased the boat Oct, 2012
Projects Completed:
- refinished Swim Platform
- replaced leaking tranny cooler
- new Bluetooth enabled stereo
- Installed Faria Depth w/ air & water temp in clock hole
- repack stuffing box
- standard pre-season stuff (change oil, change trans fluid, impeller, spark plugs, check timing
- stop-gap refinish of trailer paint
- new carpet on trailer bunks and new bow stops
- new trailer break actuator
- spare tire holder
Projects on the list
- Gel coat patch three spots
- Buff exterior (wet sand if needed)
- install manufacturer stickers
- clean-up gauge wires and run new ground wire (tach seems low, gas gauge is jumpy)
- replace temp gauge with VDO
- bimini top